CP Portal
login
close dropdown menu
  • Customer IT zone
  • Settings
Logout

  • Products
    • Overview
    • The All IP Programme
      • Overview
      • Exchange Exit
      • Test Lab
      • Businesses and Services
      • Stop sell
      • WLR Withdrawal
      • Collateral
      • All IP Trials
    • Fibre Broadband
      • Overview
      • Ultrafast
      • FTTP
      • FTTP on Demand
      • Gfast
      • SOGfast
      • Superfast
      • FTTC
      • SOGEA
      • Installation Options
      • Overlay Services (GEA Multicast)
      • Fibre contracts
      • Knotx
    • Copper
      • Overview
      • MPF & SMPF
      • Broadband Enabling Technology (BET)
      • WLR
      • Wholesale Analogue Access (PSTN)
      • Wholesale Line Rental 3 (WLR3) Premium
      • Calling and network features
      • Wholesale Digital Access ISDN2
      • Wholesale Digital Access ISDN30
      • SOTAP
      • Copper contracts
      • Local Loop Unbundling (LLU)
      • Sub Loop Unbundling (SLU)
    • Ethernet
      • Overview
      • Ethernet Access Direct
      • Ethernet Backhaul Direct
      • Specialist access services
      • Ethernet data centres
      • Resilience
      • Contracts
      • Ethernet Access Direct Sensitive
    • Optical
      • Overview
      • Optical Spectrum Access (OSA)
      • Optical Spectrum Extended Access(OSEA)
      • Resilience
    • Passive products
      • Overview
      • Physical Infrastructure Access(PIA)
      • Mobile Infill Infrastructure Solution
      • Passive contracts
      • Building Digital UK (BDUK)
      • Dark Fibre
    • Exchange Based Products
      • Overview
      • Co-mingling
      • Access Locate and Access Locate Plus
      • Internal tie cable
      • Enhanced specification internal tie cable
      • Ethernet Cablelink
      • Distant location
      • GEA Cablelink
      • Network investigation process
      • Contracts
    • Product Development Processes and release information
      • Overview
      • Statement of Requirements (SOR) Process
      • Openreach Product Development Process (C2M)
      • Product release documentation (EIP Comms)
      • Product roadmap
    • Product withdrawal
      • Overview
      • Backhaul Extension Services (BES)
      • Backhaul Network Services (BNS)
      • Openreach Network Backhaul Services (ONBS)
      • TDM (Time Division Multiplex) access bearer
      • Wholesale Extension Services (WES) and Wholesale End-to-End Services (WEES)
      • WES Aggregation
      • CCTV Access
      • Fibre Voice Access
      • Wlr Withdrawal
      • Stop Sells Updates
    • Ancillary Documents (Change Control)
    • Contracts
      • Overview
      • SOGEA and SOGfast
      • Data Privacy
    • Industry Consultations
    • FlexZones
    • Product Process descriptions
      • Overview
      • FTTP
    • Pricing
  • Services
    • Overview
    • Product services
      • Overview
      • Flexible appointments
      • Number portability
      • Events and exhibitions
      • Non standard lines
      • Network in advance
      • Stand alone survey (SAS)
      • Excess construction charges (ECC)
      • Directory and number information
      • Nuisance Calls Service
      • Ethernet transfer of service
      • Advanced order management process
      • Special fault investigation assure
      • Service maintenance levels
      • Product migrations
      • Bulk modifications
      • Time related charges (TRCs)
      • Large Scale Time Related Charges
      • Transfer of service
      • Name changes
      • Novations
      • Service products contracts
      • KPIs
      • Service Level Commitments
      • Digital Price Book
      • One Touch Switch
      • Direct End Customer Contact
    • Discover our infrastructure build and value add services
      • Overview
      • Infrastructure
      • Full fibre infrastructure build (FFIB)
      • Engineering services
      • Project services
    • Bid Management
    • Wayleaves
  • Industry Engagement
    • Overview
    • Groups
      • Overview
    • Events
      • Overview
  • Updates
    • Overview
    • Briefings
      • General briefings
    • Matters Beyond Our Reasonable Control
    • Calls
    • System notifications
    • Notifications
      • Overview
      • Notifications
      • COVID 19
    • Status
  • Help & Support
    • Overview
    • FAQs
    • Guides
    • Customer service plans
      • Overview
      • Ethernet Services
      • WLR
      • LLU
      • Ultrafast and Superfast Fibre Access
      • Physical Infrastructure Access (PIA)
      • MiiS
      • Dark Fibre (DF)
      • CSP Common Sections
    • Customer test services
    • Customer establishment
    • Ethernet Deemed Consent
    • Suppliers’ information notes (SINS)
      • Supporting Documents
    • How to contact Openreach
    • How to use the portal
    • Help with the portal
      • Help with the portal
    • Risk Assessment and Method Statement
    • Single Sign On
    • Sabor
    • Transflex
    • Reports
  • Dashboard
  • Network Status
  • CP Admin
  • Site Admin
  • Reseller Portal
  1. Home
  2. Help & Support
  3. Customer service plans
  4. CSP Common Sections
  5. MANUAL FAULTS
Share

Follow this page

Customer Service Plan

Select your product to see the specific
Customer Service Plan

CSP Common Sections - version 01

Download Full Document

  • Getting started
  • Provision
  • Repair
  • SPIRIT PROCESS (Provision)
  • High Impact Provision of Service (HIPoS)
  • DISPUTED NO ACCESS (DNA)
  • RESTORATION OF SERVICE (ROS / USR)
  • FIBRE SERVICE
  • Number porting
  • NETWORK ADDRESSING
  • Additional Services
  • MANUAL FAULTS
  • Complaints
  • Damage, Hazards to public safety
  • Expedites
  • DSO
  • Emergency welfare
  • PEWs and Major Incidents
  • Application Service Desk
  • Billing
  • Service Level Guarantees
  • Building Access, Accident Reporting
  • Infrastructure Solutions
  • Expedited Faulty Ports Delay and Tie Pair queries
  • Change Log
  • MODULE TEMPLATE

MANUAL FAULTS

Last updated: 03 October, 2024

Applicable Products

FTTP

FTTC

SOTAP

SOGEA

WLR

LLU

Ethernet

Dark Fibre

PIA

MiiS

Yes

Yes

Planned for future

Yes

Yes

Yes

No

No

No

No

12.01. Reference number not received

If you have not received a valid Openreach Reference Number, this can be due to data integrity errors which can often be resolved by using the ORDI tool. More information on the ORDI process can be found at:

https://www.openreach.co.uk/cpportal/cpzone-ciz/information-and-user-guides

12.02. When manual faults can be raised

Manual faults can only be raised when the EMP fault raising platform cannot be used due to planned or unplanned outages, system failures, or if requested to by CSM (Customer Services Management).

The completed proforma(s) should be attached to an email and sent to CSM address listed at the bottom of the proforma (auto populated when “Circuit Type” is selected) . The fault requests will be validated and processed by CSM teams who will provide KCI updates via return email. Notice will be given by return email for any requests that fail validation.

Please note: - emails must contain single requests (one proforma) only; multiple fault requests can be made but will require an additional email for each fault request proforma.

12.03. Manual Fault Proforma

12.03.1 WLR Proforma:

  • Manual Fault Proforma

    Manual Fault Proforma
    Size: 37 KB Download

12.03.2 FTTC, FTTP & FVR Proforma:

  • NGA Manual Fault Proforma

    NGA Manual Fault Proforma
    Size: 58 KB Download

12.03.3 LLU Proforma:

  • LLU Manual Fault Proforma August

    LLU Manual Fault Proforma August
    Size: 29 KB Download

12.03.4 SOTAP Proforma (not yet available)

12.04. Contact & Escalation points

If your request concerns an Emergency Welfare customer, and this is during an EMP planned / unplanned outage - please title your fault request “Emergency Welfare - Manual Fault Request”. This will ensure the request is prioritised above other lower priority faults.

Level

Operating Hours

Contact details

Initial contact

Mon-Sat:

08:00-18:00

? Maybe list by product?

WLR: wlr.assurance.emp@openreach.co.uk

FTTC, FTTP, FVR: orfttcassur@openreach.co.uk 

LLU: lluassuranceemp@openreach.co.uk

SOTAP: TBC  

1st Escalation Point

Mon-Sat:

08:00-18:00

julius.2.prasanna@openreach.co.uk

nizam.uddin@openreach.co.uk

2nd Escalation Point

Mon-Sat:

08:00-18:00

anuj.bahl@openreach.co.uk  

3rd Escalation Point

Mon-Sat:

08:00-18:00

shikha.jalali@openreach.co.uk

  • Help and Support
    • Overview
    • Damage Health and safety
    • Questions about fibre availability
    • Crimes and scams
    • How to contact Openreach
    • How to use the portal
    • When can I get fibre
  • About us
    • Overview
    • Who we are
    • Leadership and Governance
    • Our history
    • Our performance
    • Openreach.com
Follow us

Follow us

Twitter Created with Sketch.
Facebook Created with Sketch.
  • News and Opinion
  • Press and media
  • Privacy policy
  • Terms and conditions
  • Disclaimer
  • Cookies
  • Accessibility
  • Commitments monitoring office
  • Equivalence

© British Telecommunications Limited 2026