CP Portal
login
close dropdown menu
  • Customer IT zone
  • Settings
Logout

  • Products
    • Overview
    • The All IP Programme
      • Overview
      • Exchange Exit
      • Test Lab
      • Businesses and Services
      • Stop sell
      • WLR Withdrawal
      • Collateral
      • All IP Trials
    • Fibre Broadband
      • Overview
      • Ultrafast
      • FTTP
      • FTTP on Demand
      • Gfast
      • SOGfast
      • Superfast
      • FTTC
      • SOGEA
      • Installation Options
      • Overlay Services (GEA Multicast)
      • Fibre contracts
      • Knotx
    • Copper
      • Overview
      • MPF & SMPF
      • Broadband Enabling Technology (BET)
      • WLR
      • Wholesale Analogue Access (PSTN)
      • Wholesale Line Rental 3 (WLR3) Premium
      • Calling and network features
      • Wholesale Digital Access ISDN2
      • Wholesale Digital Access ISDN30
      • SOTAP
      • Copper contracts
      • Local Loop Unbundling (LLU)
      • Sub Loop Unbundling (SLU)
    • Ethernet
      • Overview
      • Ethernet Access Direct
      • Ethernet Backhaul Direct
      • Specialist access services
      • Ethernet data centres
      • Resilience
      • Contracts
      • Ethernet Access Direct Sensitive
    • Optical
      • Overview
      • Optical Spectrum Access (OSA)
      • Optical Spectrum Extended Access(OSEA)
      • Resilience
    • Passive products
      • Overview
      • Physical Infrastructure Access(PIA)
      • Mobile Infill Infrastructure Solution
      • Passive contracts
      • Building Digital UK (BDUK)
      • Dark Fibre
    • Exchange Based Products
      • Overview
      • Co-mingling
      • Access Locate and Access Locate Plus
      • Internal tie cable
      • Enhanced specification internal tie cable
      • Ethernet Cablelink
      • Distant location
      • GEA Cablelink
      • Network investigation process
      • Contracts
    • Product Development Processes and release information
      • Overview
      • Statement of Requirements (SOR) Process
      • Openreach Product Development Process (C2M)
      • Product release documentation (EIP Comms)
      • Product roadmap
    • Product withdrawal
      • Overview
      • Backhaul Extension Services (BES)
      • Backhaul Network Services (BNS)
      • Openreach Network Backhaul Services (ONBS)
      • TDM (Time Division Multiplex) access bearer
      • Wholesale Extension Services (WES) and Wholesale End-to-End Services (WEES)
      • WES Aggregation
      • CCTV Access
      • Fibre Voice Access
      • Wlr Withdrawal
      • Stop Sells Updates
    • Ancillary Documents (Change Control)
    • Contracts
      • Overview
      • SOGEA and SOGfast
      • Data Privacy
    • Industry Consultations
    • FlexZones
    • Product Process descriptions
      • Overview
      • FTTP
    • Pricing
  • Services
    • Overview
    • Product services
      • Overview
      • Flexible appointments
      • Number portability
      • Events and exhibitions
      • Non standard lines
      • Network in advance
      • Stand alone survey (SAS)
      • Excess construction charges (ECC)
      • Directory and number information
      • Nuisance Calls Service
      • Ethernet transfer of service
      • Advanced order management process
      • Special fault investigation assure
      • Service maintenance levels
      • Product migrations
      • Bulk modifications
      • Time related charges (TRCs)
      • Large Scale Time Related Charges
      • Transfer of service
      • Name changes
      • Novations
      • Service products contracts
      • KPIs
      • Service Level Commitments
      • Digital Price Book
      • One Touch Switch
      • Direct End Customer Contact
    • Discover our infrastructure build and value add services
      • Overview
      • Infrastructure
      • Full fibre infrastructure build (FFIB)
      • Engineering services
      • Project services
    • Bid Management
    • Wayleaves
  • Industry Engagement
    • Overview
    • Groups
      • Overview
    • Events
      • Overview
  • Updates
    • Overview
    • Briefings
      • General briefings
    • Matters Beyond Our Reasonable Control
    • Calls
    • System notifications
    • Notifications
      • Overview
      • Notifications
      • COVID 19
    • Status
  • Help & Support
    • Overview
    • FAQs
    • Guides
    • Customer service plans
      • Overview
      • Ethernet Services
      • WLR
      • LLU
      • Ultrafast and Superfast Fibre Access
      • Physical Infrastructure Access (PIA)
      • MiiS
      • Dark Fibre (DF)
      • CSP Common Sections
    • Customer test services
    • Customer establishment
    • Ethernet Deemed Consent
    • Suppliers’ information notes (SINS)
      • Supporting Documents
    • How to contact Openreach
    • How to use the portal
    • Help with the portal
      • Help with the portal
    • Risk Assessment and Method Statement
    • Single Sign On
    • Sabor
    • Transflex
    • Reports
  • Dashboard
  • Network Status
  • CP Admin
  • Site Admin
  • Reseller Portal
  1. Home
  2. Help & Support
  3. Customer service plans
  4. CSP Common Sections
  5. FIBRE SERVICE
Share

Follow this page

Customer Service Plan

Select your product to see the specific
Customer Service Plan

CSP Common Sections - version 01

Download Full Document

  • Getting started
  • Provision
  • Repair
  • SPIRIT PROCESS (Provision)
  • High Impact Provision of Service (HIPoS)
  • DISPUTED NO ACCESS (DNA)
  • RESTORATION OF SERVICE (ROS / USR)
  • FIBRE SERVICE
  • Number porting
  • NETWORK ADDRESSING
  • Additional Services
  • MANUAL FAULTS
  • Complaints
  • Damage, Hazards to public safety
  • Expedites
  • DSO
  • Emergency welfare
  • PEWs and Major Incidents
  • Application Service Desk
  • Billing
  • Service Level Guarantees
  • Building Access, Accident Reporting
  • Infrastructure Solutions
  • Expedited Faulty Ports Delay and Tie Pair queries
  • Change Log
  • MODULE TEMPLATE

FIBRE SERVICE

Last updated: 03 October, 2024

Applicable Products

FTTP

FTTC

SOTAP

SOGEA

WLR

LLU

Ethernet

Dark Fibre

PIA

MiiS

Yes

Yes

Yes

Yes

Yes

Yes

 

 

 

 

8.01. Fibre Availability

Fibre Broadband Availability – Communications Provider https://openreach.secure.force.com/form/?CPForm

This service allows CPs to raise enquiries with Openreach to provide information, for the purpose of assisting with raising orders, about when and where fibre network is deployed, including: 

  • FTTC, e.g. Planned, Waiters and Speed’ enquiries (the Openreach managed line checker is not showing availability when it is believed it should)
  • FTTP Brownfield, e.g. Gold address key is not available or address issues (the Openreach managed line checker is not showing availability when it is believed it should)
  • FTTP ‘Planned’ and ‘Waiters’ enquiries
  • Routing issues
  • Gold address key required to allow a FOD order to be placed 

Non-FTTP: see Section 12 Network addressing

If you cannot find the Gold Key that you require, please place your order using a Silver Key if it is available, or use a bronze key for an address that does not show up in the Address matching dialogue service. If you have difficulty placing an order against a Gold, Silver or Bronze key then please use the ORDI robot to have the problem corrected in the first instance.  Information about ORDI is held on the Customer IT Zone on the Openreach portal, including ORDI contacts (held in the Customer Service Management Catalogue).

https://www.openreach.co.uk/cpportal/cpzone-ciz/information-and-user-guides   

Navigate through the form to select the appropriate enquiry type. 

NOTE: We are not able to upgrade a Silver Key to a Gegories:

First point of contact

https://openreach.secure.force.com/form/?CPForm   

1st line escalation

Use if no response within 5 days of case creation or if KCI date has been missed by 24 hours (1 working day).

CHECK eMLC for records updates before escalating.

Email fibrecustomerservice@openreach.co.uk

Your subject field MUST have our case reference at the start and state LEVEL 1

Subject field e.g. “QIS123456 – LEVEL 1”

Please note not including the above information of failing to use the correct email address may result in a delayed or no reply

2nd line escalation

Use if no response to LEVEL 1 within 24 working hours (1 working day)

CHECK eMLC for records updates before escalating

Email fibrecustomerservice@openreach.co.uk

Your email MUST include your previous LEVEL 1 email in the body

Your subject field MUST have our case reference at the start and state LEVEL 2

Subject field e.g. “QIS123456 – LEVEL 2”

Please note not including the above information or failing to use the correct email address may result in a delayed or no reply 

3rd line escalation

Use if no response to LEVEL 2- after 24 hours

CHECK eMLC for updates before escalating.

Email fibrecustomerservice@openreach.co.uk

Your email MUST include your previous LEVEL 1&2 emails in the body

Subject field e.g. “QIS123456 – LEVEL 3”

Please note not including the above information or failing to use the correct email address may result in a delayed or no reply 

8.02. FTTP Newsites Greenfield

8.2.1 - FTTP new sites (Greenfield) not ready for service – NRFS

https://openreach.secure.force.com/form/?NewsitesCPForm

This is when you believe the plot, house or commercial premises should be occupied and you have a move-in date for your end customer which must be within the next 4 weeks.

The address is matched (gold key) and eMLC shows ‘N’ to any of the fibre availability statements and you are unable to place an order because: 

  • Network build incomplete
  • The address has not been called off/commissioned
  • eMLC shows ‘N’ (but address has FTTP installed)
  • ONT serial number is mismatched

Please see the escalation route if you haven’t received a response to your enquiry within 5 working days. Please check the records in eMLC for any updates before you escalate

8.2.2 - FTTP new sites (Greenfield) ready for service – RFS 

This is where the address matching tool displays the correct gold NAD key and…

EMLC shows ‘Y’ for FTTP Existing ONT available and gives you the correct serial number 

  • Network has been built
  • ONT fitted (showing solid green light)
  • Still unable to place order
  • FTTP Greenfield, e.g. the address is ready for service (RFS), but still unable to place an order or the address is not ready for service (NRFS) on the date expected

Please see the escalation route if you haven’t received a response to your enquiry within 5 working days. Please check records in eMLC for any updates before you escalate

First point of contact

https://openreach.secure.force.com/form/?NewsitesCPForm  

1st line escalation

Use if no response within 5 days of case creation or if KCI date has been missed by 24 hours (1 working day).

CHECK eMLC for records updates before escalating.

Email fttpcp@openreach.co.uk

Your subject field MUST have our case reference at the start and state LEVEL 1

Subject field e.g. “QIS123456 – LEVEL 1”

Please note not including the above information of failing to use the correct email address may result in a delayed or no reply

2nd line escalation

Use if no response to LEVEL 1 within 24 working hours (1 working day)

CHECK eMLC for records updates before escalating

Email fttpcp@openreach.co.uk

Your email MUST include your previous LEVEL 1 email in the body

Your subject field MUST have our case reference at the start and state LEVEL 2

Subject field e.g. “QIS123456 – LEVEL 2”

Please note not including the above information or failing to use the correct email address may result in a delayed or no reply 

3rd line escalation

Use if no response to LEVEL 2- after 24 hours

CHECK eMLC for updates before escalating.

Email fttpcp@openreach.co.uk

Your email MUST include your previous LEVEL 1&2 emails in the body

Subject field e.g. “QIS123456 – LEVEL 3”

Please note not including the above information or failing to use the correct email address may result in a delayed or no reply 

8.3.1 FTTP new sites (Greenfield) not ready for service (NRFS) - eMLC has a ‘P Flag’

https://openreach.secure.force.com/form/?NewsitesCPForm

This form is to be used to provide an update on an existing Pre-order, Openreach will have contacted you to ask for further information. 

In order to have an escalation accepted it must meet the following criteria

  • You believe the plot, house or commercial premises should be occupied and you have a move-in date for your end customer which must be within the next 4 weeks.
  • The address is matched (gold key) and eMLC shows ‘P’
  • The CRD has passed and you haven’t received an update from your supplier.

Please check the records in eMLC for any updates before you escalate

First point of contact

Form to provide updates on a Preorder when Openreach has contacted the CP and requested further information 

https://openreach.secure.force.com/form/?NewsitesCPForm  

1st Escalation

CHECK eMLC and HUD for records updates before escalating.

Use if pre-order raised, CRD missed and no/incomplete update from your supplier.

Email fttppreorder@openreach.co.uk

Your subject field MUST have the NAD key reference and state LEVEL 1

Subject field e.g. “NADxxxxxxxx– LEVEL 1”

Please note not including the above information or failing to use the correct email address may result in a delayed or no reply

If your escalation is raised before 2pm you will receive a response by 6pm (same day). Any escalations raised after 2pm will be responded to before 2pm the following day. 

(Opening hours are Monday to Friday 9am-5pm)

2nd Escalation

CHECK eMLC and HUD for records updates before escalating.

Use if pre-order raised, CRD missed and no/incomplete update from your supplier.

Email fttppreorder@openreach.co.uk

Your subject field MUST have the NAD key reference and state LEVEL 2

Subject field e.g. “NADxxxxxxxx– LEVEL 2”

Please note not including the above information or failing to use the correct email address may result in a delayed or no reply

We will respond within 4 working hours.

(Opening hours are Monday to Friday 9am-5pm)

3rd Escalation

CHECK eMLC and HUD for records updates before escalating.

Use if pre-order raised, CRD missed and no/incomplete update from your supplier.

Email fttppreorder@openreach.co.uk

Your subject field MUST have the NAD key reference and state LEVEL 3

Subject field e.g. “NADxxxxxxxx– LEVEL 3”

Please note not including the above information or failing to use the correct email address may result in a delayed or no reply

We will respond within 2 working hours.

 

(Opening hours are Monday to Friday 9am-5pm)

4th Escalation

If level 3 not responded to within timescale advised call 0800 328 7156, Available 09:00 – 17:00 Monday – Friday. One of the escalation team will be available to take the call.

8.3 - FTTP Fibre Only Drop-Wire Provision Process (including exception for Copper Restoration)

Openreach will use Fibre Only Drop-Wires (FODW) for FTTP installation and where the CP places an order which indicates that there is no ongoing need for an active copper service (i.e. migration order), the Openreach engineer will remove the existing copper pair drop-wire at the same time.  

At point of order CPs must confirm that the end customer does not have any equipment that will be incompatible with Voice over IP.  If the customer will need to retain copper then the CP should reflect this by placing a simple FTTP provision order and with no copper cease instruction.

8.3.1 - On the Day

The installation engineer will ask the end customer if they have any specific healthcare equipment that could be reliant on a working copper service (e.g. a pendant), if they do not, they will continue to install the FODW. If they DO have equipment that needs the copper line and if the CP order has provided an instruction to remove the copper drop-wire, then the FTTP installation will be stopped and the order returned to the CP as a Sales Query with notes referring to the healthcare equipment dependency.

If the engineer has any doubt about whether or not the existing copper drop-wire carries an active service, they will leave the copper drop-wire in place to avoid any accidental disconnection.

If the engineer cannot provide service on the day the engineer will re-install a copper dropwire or obtain assistance to do so, to ensure the end customer does not have a total loss of service and to enable active copper service following any systems-driven retention or re-ordering of copper service as described in the Copper Restoration Process section below

8.3.2 - Emergency Restoration of Copper (ERoC)

Restoring the copper alone will not guarantee service if a copper cease has been ordered.

The engineer will advise the end customer to contact their CP to either stop the cease (where the cease order has not yet been processed) on the copper service or re-order copper service. 

To re-order a copper activation CPs should follow the Emergency Restoration of Copper (ERoC) process to arrange this and this is available for reference on the Openreach portal in the Customer Service Plan at:   https://www.openreach.co.uk/cpportal/help/customer-service-plans/wlr/cpzone-emergency-restoration-of-copper-eroc  

As part of the ERoC process, for swiftest service restoration this copper service re-start order can be expedited by the CP, using the existing expedite process. To ensure that your end customer has not been left without service the engineer will advise the end customer that they must contact the CP to inform them of the delay and the CP should ensure that if they have placed any related Stand Alone Number Port / Transfer, that they should also take action to delay the date of that to align with the FTTP KCI3 and the copper cease.

The Fibre Only Drop-wire process and copper restoration exception is covered in the document below.  

8.3.3 Detailed Fibre Only Drop-Wire (FODW) Process in the Document below

  • FTTP Fibre Only Drop-Wire Provision

    FTTP Fibre Only Drop-Wire Provision
    Size: 222 KB Download
  • Help and Support
    • Overview
    • Damage Health and safety
    • Questions about fibre availability
    • Crimes and scams
    • How to contact Openreach
    • How to use the portal
    • When can I get fibre
  • About us
    • Overview
    • Who we are
    • Leadership and Governance
    • Our history
    • Our performance
    • Openreach.com
Follow us

Follow us

Twitter Created with Sketch.
Facebook Created with Sketch.
  • News and Opinion
  • Press and media
  • Privacy policy
  • Terms and conditions
  • Disclaimer
  • Cookies
  • Accessibility
  • Commitments monitoring office
  • Equivalence

© British Telecommunications Limited 2026