CP Portal
login
close dropdown menu
  • Customer IT zone
  • Settings
Logout

  • Products
    • Overview
    • The All IP Programme
      • Overview
      • Exchange Exit
      • Test Lab
      • Businesses and Services
      • Stop sell
      • WLR Withdrawal
      • Collateral
      • All IP Trials
    • Fibre Broadband
      • Overview
      • Ultrafast
      • FTTP
      • FTTP on Demand
      • Gfast
      • SOGfast
      • Superfast
      • FTTC
      • SOGEA
      • Installation Options
      • Overlay Services (GEA Multicast)
      • Fibre contracts
      • Knotx
    • Copper
      • Overview
      • MPF & SMPF
      • Broadband Enabling Technology (BET)
      • WLR
      • Wholesale Analogue Access (PSTN)
      • Wholesale Line Rental 3 (WLR3) Premium
      • Calling and network features
      • Wholesale Digital Access ISDN2
      • Wholesale Digital Access ISDN30
      • SOTAP
      • Copper contracts
      • Local Loop Unbundling (LLU)
      • Sub Loop Unbundling (SLU)
    • Ethernet
      • Overview
      • Ethernet Access Direct
      • Ethernet Backhaul Direct
      • Specialist access services
      • Ethernet data centres
      • Resilience
      • Contracts
      • Ethernet Access Direct Sensitive
    • Optical
      • Overview
      • Optical Spectrum Access (OSA)
      • Optical Spectrum Extended Access(OSEA)
      • Resilience
    • Passive products
      • Overview
      • Physical Infrastructure Access(PIA)
      • Mobile Infill Infrastructure Solution
      • Passive contracts
      • Building Digital UK (BDUK)
      • Dark Fibre
    • Exchange Based Products
      • Overview
      • Co-mingling
      • Access Locate and Access Locate Plus
      • Internal tie cable
      • Enhanced specification internal tie cable
      • Ethernet Cablelink
      • Distant location
      • GEA Cablelink
      • Network investigation process
      • Contracts
    • Product Development Processes and release information
      • Overview
      • Statement of Requirements (SOR) Process
      • Openreach Product Development Process (C2M)
      • Product release documentation (EIP Comms)
      • Product roadmap
    • Product withdrawal
      • Overview
      • Backhaul Extension Services (BES)
      • Backhaul Network Services (BNS)
      • Openreach Network Backhaul Services (ONBS)
      • TDM (Time Division Multiplex) access bearer
      • Wholesale Extension Services (WES) and Wholesale End-to-End Services (WEES)
      • WES Aggregation
      • CCTV Access
      • Fibre Voice Access
      • Wlr Withdrawal
      • Stop Sells Updates
    • Ancillary Documents (Change Control)
    • Contracts
      • Overview
      • SOGEA and SOGfast
      • Data Privacy
    • Industry Consultations
    • FlexZones
    • Product Process descriptions
      • Overview
      • FTTP
    • Pricing
  • Services
    • Overview
    • Product services
      • Overview
      • Flexible appointments
      • Number portability
      • Events and exhibitions
      • Non standard lines
      • Network in advance
      • Stand alone survey (SAS)
      • Excess construction charges (ECC)
      • Directory and number information
      • Nuisance Calls Service
      • Ethernet transfer of service
      • Advanced order management process
      • Special fault investigation assure
      • Service maintenance levels
      • Product migrations
      • Bulk modifications
      • Time related charges (TRCs)
      • Large Scale Time Related Charges
      • Transfer of service
      • Name changes
      • Novations
      • Service products contracts
      • KPIs
      • Service Level Commitments
      • Digital Price Book
      • One Touch Switch
      • Direct End Customer Contact
    • Discover our infrastructure build and value add services
      • Overview
      • Infrastructure
      • Full fibre infrastructure build (FFIB)
      • Engineering services
      • Project services
    • Bid Management
    • Wayleaves
  • Industry Engagement
    • Overview
    • Groups
      • Overview
    • Events
      • Overview
  • Updates
    • Overview
    • Briefings
      • General briefings
    • Matters Beyond Our Reasonable Control
    • Calls
    • System notifications
    • Notifications
      • Overview
      • Notifications
      • COVID 19
    • Status
  • Help & Support
    • Overview
    • FAQs
    • Guides
    • Customer service plans
      • Overview
      • Ethernet Services
      • WLR
      • LLU
      • Ultrafast and Superfast Fibre Access
      • Physical Infrastructure Access (PIA)
      • MiiS
      • Dark Fibre (DF)
      • CSP Common Sections
    • Customer test services
    • Customer establishment
    • Ethernet Deemed Consent
    • Suppliers’ information notes (SINS)
      • Supporting Documents
    • How to contact Openreach
    • How to use the portal
    • Help with the portal
      • Help with the portal
    • Risk Assessment and Method Statement
    • Single Sign On
    • Sabor
    • Transflex
    • Reports
  • Dashboard
  • Network Status
  • CP Admin
  • Site Admin
  • Reseller Portal
  1. Home
  2. Help & Support
  3. Customer service plans
  4. Getting started
  5. Services
Share

Follow this page

Customer Service Plan

Select your product to see the specific
Customer Service Plan

Ultrafast and Superfast Fibre Access - version 8.40

Download Full Document

  • Getting started
  • Product overview
  • Orders
  • Repair
  • Escalations
  • Compliance – third party damage report
  • Planned Engineering Works (PEWs) and Post Incident Report Requests
  • Service guarantee
  • Billing
  • Complaints
  • Directors Service Office (DSO)
  • Emergency welfare
  • Services
  • WLR3 PSTN with GEA-FTTC/Gfast Expedite
  • Appointed Journey Process – potential issue contact
  • Service Level Agreements and Service Level Guarantees

Services

Last updated: 05 September, 2025

For all System/IT issues and information regarding the services offered by the Openreach Applications Support Desk, all customers should refer to the generic “Customer Service Management Catalogue” held on the Customer IT Zone on the Openreach Portal.

https://www.openreach.co.uk/cpportal/cpzone-ciz/information-and-user-guides

Network addressing

Order placement for GEA-FTTP and FOD (FTTP on Demand) does not support the use of a Silver or Bronze address key, and the ORDI process below should not be used for GEA-FTTP and FOD enquiries.  If you cannot find the Gold key that you require, or have difficulty placing an order for GEA-FTTP or FOD, please follow the fibre availability enquiries process outlined in section 2.2 of this document, and select the appropriate option from the Formwize

 (https://www.formwize.openreach.co.uk/run/survey3.cfm?idx=505d040e0b0808). 

Non-FTTP:

If you cannot find the Gold Key that you require, please place your order using a Silver Key if it is available, or use a bronze key for an address that does not show up in the Address matching dialogue service. If you have difficulty placing an order against a Gold, Silver or Bronze key then please use the ORDI robot to have the problem corrected in the first instance.  Information about ORDI is held on the Customer IT Zone on the Openreach portal, including ORDI contacts (held in the Customer Service Management Catalogue).

https://www.openreach.co.uk/cpportal/cpzone-ciz/information-and-user-guides

When sending escalations to the Network Addressing Team, please ensure you’re adhering to the following

  • Please allow 48 hours for the progression of any orders you send in via email. This will allow time for orders to be actioned.
  • Please only email only once if the original request is over 48 hours old.
  • All emails are dealt with in the order they arrive.
  • Please do not duplicate emails within the 48-hour window. If you have already sent in the request, it will be actioned. 
  • Please only escalate to Named contacts if your request falls outside of the above.

Level of contact

Named person

Points of contact

Meaningful update

When to Escalate


Data cleanse update

 

network.addressing@openreach.co.uk

48 Working Hours of receipt

When the ORDI process has failed

Data cleanse update

1st escalation (48hrs)

Taighler Clark,

Jade Davies

taighler.clark@openreach.co.uk

jade.davies@openreach.co.uk

48 Working Hours of receipt

When Level 1 action did not resolve the issue at hand or has not met the SLA the response time

Data Cleanse Update queries

2nd Escalation (24hrs)

Ricky Beresford

ricky.beresford@openreach.co.uk

24 Working Hours of receipt

When Level 2 action did not resolve the issue at hand or has not met the SLA the response time

Data Cleanse Update queries

3rd Escalation (24hrs)

Paul Fowle

paul.fowle@openreach.co.uk

24 Working Hours of receipt

When all contact  points have not resolved the issue in hand and all SLA times have surpassed

 

Application Support Desk

For all system/IT issues and information regarding the services offered by the Openreach Applications Support Desk, all customers should refer to the generic "Customer Service Management Catalogue" held on the Customer IT Zone on the Openreach Portal.

https://www.openreach.co.uk/cpportal/cpzone-ciz/information-and-user-guides

The ASD will monitor report and escalate incidents to resolution. However, for those incidents not resolved at first point of contact, the responsibility for resolution lies with Openreach second line support teams.

Please note that if an incident is not cleared within the advised target time, CPs can request an escalation of the case. Please see table below for details of this escalation process.

Level

Name

Telephone

Email-address

First Contact

Application  Service Desk

0800 085 1287

Option 3

CP should request an escalation on their Incident and quote the Incident reference number.

The ASD will escalate the case following our internal escalation processes.

 

PLEASE NOTE:  P3 incidents have an SLA of 85% within 48 Elapsed hours.  The ASD will NOT escalate a case if within this SLA unless there are mitigating circumstances where escalation is appropriate (e.g.  impact on service has increased significantly since first reported

For escalations, please telephone the ASD – Alternatively please use the Amend Notes feature via the Incident Management Tool  We aim to respond to this request within 24 hours

1st Escalation

 

ASD Manager

 

https://www.formwize.openreach.co.uk/run/survey3.cfm?idx=505d0408090f0b0a

We aim to respond to this request within 24 hours

2nd Level Escalation

 

 

Please escalate using the link below if failed commitment at First level escalation. A manager will review and respond

  • Help and Support
    • Overview
    • Damage Health and safety
    • Questions about fibre availability
    • Crimes and scams
    • How to contact Openreach
    • How to use the portal
    • When can I get fibre
  • About us
    • Overview
    • Who we are
    • Leadership and Governance
    • Our history
    • Our performance
    • Openreach.com
Follow us

Follow us

Twitter Created with Sketch.
Facebook Created with Sketch.
  • News and Opinion
  • Press and media
  • Privacy policy
  • Terms and conditions
  • Disclaimer
  • Cookies
  • Accessibility
  • Commitments monitoring office
  • Equivalence

© British Telecommunications Limited 2026