CP Portal
login
close dropdown menu
  • Customer IT zone
  • Settings
Logout

  • Products
    • Overview
    • The All IP Programme
      • Overview
      • Exchange Exit
      • Test Lab
      • Businesses and Services
      • Stop sell
      • WLR Withdrawal
      • Collateral
      • All IP Trials
    • Fibre Broadband
      • Overview
      • Ultrafast
      • FTTP
      • FTTP on Demand
      • Gfast
      • SOGfast
      • Superfast
      • FTTC
      • SOGEA
      • Installation Options
      • Overlay Services (GEA Multicast)
      • Fibre contracts
      • Knotx
    • Copper
      • Overview
      • MPF & SMPF
      • Broadband Enabling Technology (BET)
      • WLR
      • Wholesale Analogue Access (PSTN)
      • Wholesale Line Rental 3 (WLR3) Premium
      • Calling and network features
      • Wholesale Digital Access ISDN2
      • Wholesale Digital Access ISDN30
      • SOTAP
      • Copper contracts
      • Local Loop Unbundling (LLU)
      • Sub Loop Unbundling (SLU)
    • Ethernet
      • Overview
      • Ethernet Access Direct
      • Ethernet Backhaul Direct
      • Specialist access services
      • Ethernet data centres
      • Resilience
      • Contracts
      • Ethernet Access Direct Sensitive
    • Optical
      • Overview
      • Optical Spectrum Access (OSA)
      • Optical Spectrum Extended Access(OSEA)
      • Resilience
    • Passive products
      • Overview
      • Physical Infrastructure Access(PIA)
      • Mobile Infill Infrastructure Solution
      • Passive contracts
      • Building Digital UK (BDUK)
      • Dark Fibre
    • Exchange Based Products
      • Overview
      • Co-mingling
      • Access Locate and Access Locate Plus
      • Internal tie cable
      • Enhanced specification internal tie cable
      • Ethernet Cablelink
      • Distant location
      • GEA Cablelink
      • Network investigation process
      • Contracts
    • Product Development Processes and release information
      • Overview
      • Statement of Requirements (SOR) Process
      • Openreach Product Development Process (C2M)
      • Product release documentation (EIP Comms)
      • Product roadmap
    • Product withdrawal
      • Overview
      • Backhaul Extension Services (BES)
      • Backhaul Network Services (BNS)
      • Openreach Network Backhaul Services (ONBS)
      • TDM (Time Division Multiplex) access bearer
      • Wholesale Extension Services (WES) and Wholesale End-to-End Services (WEES)
      • WES Aggregation
      • CCTV Access
      • Fibre Voice Access
      • Wlr Withdrawal
      • Stop Sells Updates
    • Ancillary Documents (Change Control)
    • Contracts
      • Overview
      • SOGEA and SOGfast
      • Data Privacy
    • Industry Consultations
    • FlexZones
    • Product Process descriptions
      • Overview
      • FTTP
    • Pricing
  • Services
    • Overview
    • Product services
      • Overview
      • Flexible appointments
      • Number portability
      • Events and exhibitions
      • Non standard lines
      • Network in advance
      • Stand alone survey (SAS)
      • Excess construction charges (ECC)
      • Directory and number information
      • Nuisance Calls Service
      • Ethernet transfer of service
      • Advanced order management process
      • Special fault investigation assure
      • Service maintenance levels
      • Product migrations
      • Bulk modifications
      • Time related charges (TRCs)
      • Large Scale Time Related Charges
      • Transfer of service
      • Name changes
      • Novations
      • Service products contracts
      • KPIs
      • Service Level Commitments
      • Digital Price Book
      • One Touch Switch
      • Direct End Customer Contact
    • Discover our infrastructure build and value add services
      • Overview
      • Infrastructure
      • Full fibre infrastructure build (FFIB)
      • Engineering services
      • Project services
    • Bid Management
    • Wayleaves
  • Industry Engagement
    • Overview
    • Groups
      • Overview
    • Events
      • Overview
  • Updates
    • Overview
    • Briefings
      • General briefings
    • Matters Beyond Our Reasonable Control
    • Calls
    • System notifications
    • Notifications
      • Overview
      • Notifications
      • COVID 19
    • Status
  • Help & Support
    • Overview
    • FAQs
    • Guides
    • Customer service plans
      • Overview
      • Ethernet Services
      • WLR
      • LLU
      • Ultrafast and Superfast Fibre Access
      • Physical Infrastructure Access (PIA)
      • MiiS
      • Dark Fibre (DF)
      • CSP Common Sections
    • Customer test services
    • Customer establishment
    • Ethernet Deemed Consent
    • Suppliers’ information notes (SINS)
      • Supporting Documents
    • How to contact Openreach
    • How to use the portal
    • Help with the portal
      • Help with the portal
    • Risk Assessment and Method Statement
    • Single Sign On
    • Sabor
    • Transflex
    • Reports
  • Dashboard
  • Network Status
  • CP Admin
  • Site Admin
  • Reseller Portal
  1. Home
  2. Help & Support
  3. Customer service plans
  4. Getting started
  5. Planned Engineering Works (PEWs) and Post Incident Report Requests
Share

Follow this page

Customer Service Plan

Select your product to see the specific
Customer Service Plan

Ultrafast and Superfast Fibre Access - version 8.40

Download Full Document

  • Getting started
  • Product overview
  • Orders
  • Repair
  • Escalations
  • Compliance – third party damage report
  • Planned Engineering Works (PEWs) and Post Incident Report Requests
  • Service guarantee
  • Billing
  • Complaints
  • Directors Service Office (DSO)
  • Emergency welfare
  • Services
  • WLR3 PSTN with GEA-FTTC/Gfast Expedite
  • Appointed Journey Process – potential issue contact
  • Service Level Agreements and Service Level Guarantees

Planned Engineering Works (PEWs) and Post Incident Report Requests

Last updated: 05 September, 2025

Planned Work/Service Outage

Service may be interrupted for operational reasons (such as maintenance or Service upgrades) or because of an emergency. We will restore the interrupted Service as quickly as possible.  We will give the Communications Provider as much notice as possible and aims to give the Communications Provider at least 14 days’ notice of any interruption to the Service for operational reasons.  Where practicable, we will agree with the Communications Provider when the Service will be interrupted.  If there has been an interruption to the Service for operational or emergency reasons, we will inform the Communications Provider that there has been an interruption as soon as reasonably practicable.

Planned Engineering Work is broken down into 3 categories standard, emergency and routine. Where a PEW is planned that may result in a disruption to your service, we will endeavour to give 14 days prior notice. This is to allow you time to limit any impact on your own operations and to provide time for you to advise your end users. All standard Openreach Planned Engineering Works which are likely to have an impact on your service will where possible is completed between midnight and 6am On occasions we do have to perform emergency work and in such cases we will endeavour to give as much prior notice as possible prior to the start of the PEW. We will not provide any notifications of routine maintenance work.

  • The PEW notification will provide you with the following details:
  • The PEW case number.
  • The planned work type, i.e. standard or emergency.
  • The location.
  • The start date and time.
  • The end date and time.
  • The products affected
  • A brief description of the work to be completed. 

Where the planned dates and time of a PEW window may not be at a convenient time you should raise the concern via the objections section provided within the PEW notice document. If the standard PEW affects a single CP we may contact you directly to try and agree a suitably convenient time. Where more than one CP is affected by the PEW we will endeavour to provide at least 14 days notification, informing them of the date, time and outage.

In order to ensure that PEW notifications are passed to the correct contacts you will need to ensure your service manager has the correct email address details.

Openreach PEW duty contact details:

We have a managed process in place to try to reduce the impact of planned engineering work (PEW), to make sure, wherever possible, that you have advanced warning and can pass this on to your customers if they’re likely to be affected.

PEWs are broken down into two categories:

  • Standard
  • Emergency

If engineering work is planned that may cause disruption to your service, we’ll endeavour to give you twelve working days’ notice. This is to give you time to limit any impact on your own operations and your customers’.

On occasions we have to perform emergency work. When this happens we’ll endeavour to give as much notice as possible.

If the standard planned engineering work affects a single customer, we may contact you directly to try and agree on a convenient time. 

Team

Contact details

Openreach Planned Works Duty

e-mail: openreach.pew@openreach.co.uk

Reverse PEW notifications

CPs carrying out essential maintenance or upgrade work on their equipment located within an exchange should submit via email a PEW notification to the Openreach Planned Works duty (above). Onward notification to other BT group agencies and alarm surveillance teams will be provided by the Openreach PEW duty.

Major Service Outage (MSO)

In support of the SFFA network as a premium service, we have established an Access Operation/Service Centre (AOC) to proactively monitor the SFFA network service and to drive corrective action when service impacting events are detected.

To help our customers understand the status of the network and the impact a network event may have on their own customers, we will proactively communicate network problems to you in the form of Reportable Incident Notification email with extra (impacted service IDs) information on the Portal/XML interface. We aim to identify and communicate all incidents to you in less than 15 minutes from the incident occurrence.

The level at which MSO is triggered (measured in terms of circuits impacted) is reviewed and adjusted as the network grows.  For more information on the MSO trigger level please contact your service manager. Where multiple users are affected by a protracted outage but the number of users is less than the MSO trigger level these will also be raised to MSO status and the appropriate communications published.

PEW is notified using the same process as an MSO, but giving a 14 day notice of the planned outage- general example below:.

From: do-not-reply@openreach.co.uk [mailto:do-not-reply@openreach.co.uk] 

Sent: [Date, Time]

To: CPxxxxxxxxxx

Subject: Reportable Incident Notification: OR1871321/09 reported for GEA over GEA-FTTC and Gfast

Reportable Incident Notification: OR1871321/09 reported for GEA over GEA-FTTC and Gfast

Note: 

 1) I indicate MSO, P indicates PEW, N indicates emergency PEW.

 2) Details below are separated by semi-colon.

 Reportable Incident (Type: I/P/N) has been reported for GEA over GEA-FTTC and Gfast

Please find details as below: 

Notification Type: I; Reference: OR18713/09; Openreach Ref Num: 1-5050192623; Start Time: 07/29/2009 23:45:00; Description: Shelf; Status: INITIAL; Platform: Openreach; Affected by MBORC: N; Title: FTTC POSSIBLE FIBRE/CARD FAULT @ xxxxxxx @ xxxxxxx PCP81; Extended outage reason: none; Category: N; End Time: Indicator: I; Estimated End Time: 07/30/2009 01:45:00.

Additional information on affected services will be available on OR Siebel.

During the SFFA pilot/trial Openreach has initially set the MSO trigger level at the first point of service aggregation – the DSLAM line card (FTTC) as supporting either Gfast or VDSL technology or the Fibre splitter (GEA-FTTP).  

Whilst this trigger point is at a lower level than would be traditionally viewed as an MSO in an established network - 500 effected customers, it was considered that during the early days of GEA Fibre Access rollout it would be better to let CPs know of network events that could impact a significant percentage of their customer base in a particular location, rather than only communicate if a total of 500 customers were effected.

The level of MSO trigger will be reviewed and adjusted as the network grows.  For more information on MSO trigger please contact your service manager.  Where multiple users are affected by a protracted outage but the number of users is less than the MSO trigger level these will also be raised to MSO status and the appropriate communications published.  

Post Incident Report requests

In the event of an Ultrafast and Superfast GEA Fibre Access network incident, you may request a formal PIR according to the following criteria:

  • 250+ customer end users impacted (per CP), or
  • 2 or more line cards failed impacting end user customer service, and
  • NGA device failure reported as an MSO

Requests must be submitted to your Ultrafast and Superfast GEA Fibre Access Service Manager, who should respond within 48 hours. If no response is received, the issue can be escalated to another member of the Customer Service Management Team.

If your PIR request is accepted, we will aim to produce a report within 5 working days with reasonable endeavours. All reports are returned in a standard format consisting of:-

  • Incident No
  • Incident Title
  • Date/Time Raised
  • Date/Time Cleared
  • Duration
  • Products Affected
  • Services Affected
  • Description of Events
  • Root Cause Analysis
  • Follow Up Action Plan

For further information please contact your Service Manager

  • Help and Support
    • Overview
    • Damage Health and safety
    • Questions about fibre availability
    • Crimes and scams
    • How to contact Openreach
    • How to use the portal
    • When can I get fibre
  • About us
    • Overview
    • Who we are
    • Leadership and Governance
    • Our history
    • Our performance
    • Openreach.com
Follow us

Follow us

Twitter Created with Sketch.
Facebook Created with Sketch.
  • News and Opinion
  • Press and media
  • Privacy policy
  • Terms and conditions
  • Disclaimer
  • Cookies
  • Accessibility
  • Commitments monitoring office
  • Equivalence

© British Telecommunications Limited 2026