Select your product to see the specific
Customer Service Plan
GEA-FTTC - VDSL |
Access Via the Openreach Portal |
https://www.openreach.co.uk/cpportal/home |
First contact for queries or issues |
0800 783 3333 – suspended until further notice eChat (Maximum of 1 query per session) Log in to the Openreach portal and click on the EiVA Logo in the bottom right-hand corner of the Dashboard page Once the product is selected, listen to menu for either provision and repair Mon – Sat 8am – 6pm |
For validation purposes please have your order reference and End User address ready.
(This eChat service is only available to Customers who buy their GEA-FTTC/SOGEA directly from Openreach) |
1st Escalation |
Mon – Friday 8am – 6pm |
|
2nd Escalation |
Mon – Friday 8am – 6pm |
|
3rd Escalation – Manager’s Escalation |
Mon – Friday 8am – 6pm |
FTTC - Gfast |
Access Via the Openreach Portal |
|
|
0800 783 3333 – suspended until further notice
eChateChat (Maximum of 1 query per session) Log in to the Openreach portal and click on the EiVAEiVA Logo in the bottom right hand corner of the Dashboard page
eChateChat (Maximum of 1 query per session) Log in to the Openreach portal and click on the EiVAEiVA Logo in the bottom right hand corner of the Dashboard page Mon – Sat 8am – 6pm
|
L2C - orgfastprov@openreach.co.uk
|
1s Level Escalation
|
Mon –Fri 8am – 6pm |
https://www.formwize.openreach.co.uk/run/survey3.cfm?idx=505d0408090f0b0a
|
2nd Escalation – Managers escalation |
|
Mon https://www.formwize.openreach.co.uk/run/survey3.cfm?idx=505d04080808000c – Friday 8am – 6pm |
Site-Specific Risk Assessment and Method Statement (SSRAMS)
This process provides CPs with a simple way to request a Site Specific Risk Assessment and Method Statement (SSRAMS).
SSRAMS - A site specific risk assessment that needs to be carried out at the end customers premise prior to the provision/fault appointment date. Allocation of an engineer to carry out the SSRAMS is subject to engineering availability
SSRAMS can be requested via a Formwize.
CPs can locate the Additional Service Formwize at https://www.formwize.openreach.co.uk/run/survey3.cfm?idx=505d04080b0d0b09
Further information regarding SSRAMS can be found at
https://www.openreach.co.uk/cpportal/services/product-services/risk-and-method-statements
On submitting the Form the Additional Service’s team will confirm receipt of request within 12 working hours. Failure to complete the correct fields will lead to a delay or rejection of your request.
Any issues requesting the Formwize please contact the team via eChat(EiVA) and they will help you to resolve the issue
If you are unhappy or have not received a scheduled update for your request please use the following escalation path.
Escalation Level |
Opening Hours |
Name |
|
First Contact |
Mon-Fri 0800-1800 |
eChat (EiVA) |
eChat (maximum of 1 query per session, except where orders are at the same premises) – Log in to the Openreach portal and click on the EiVA Logo in the bottom right hand corner of the Dashboard page or the View My Job Summary page
|
First Level – Customer Service Manager |
Mon-Fri 0800-1800
|
Neetu Yadav |
|
Second Level – Senior Customer Service Manager |
Mon-Fri 0800-1800
|
Abhinav Mathur |
|
Third Level – General Manager Customer Service |
Mon-Fri 0800-1800
|
Vikram Bhide |
|
Level |
Name |
Telephone |
E-mail Address/number options |
First stage check the HUD |
N/A |
Access via the Openreach portal |
https://www.openreach.co.uk/cpportal/home |
First contact for queries or issues |
N/A |
0800 783 3333 – suspended until further notice
EchateChat (Maximum of 1 query per session) Log in to the Openreach portal and click on the EivaEiVA Logo in the bottom right hand corner of the Dashboard page or the View My Job Summary page Once the product is selected, listen to the menu for either provision and repair Mon – Sat 8am – 6pm |
SOGEA Provision enquiries options Note - opt2, opt4, opt 1 (Provision) SOGfast Provision enquiries option Note – opt2, opt4, opt1, opt2 SOGEA Repair enquiries option Note - opt2, opt4, opt 2 (Repair) SOGfast Repair enquiries option Note – opt2, opt4, opt2, opt2 |
1st Escalation N.B SOGEA ONLY |
|
Mon – Friday 8am – 6pm
|
https://www.formwize.openreach.co.uk/run/survey3.cfm?idx=505d0408090f0b0a
|
2nd Escalation level |
|
Mon – Friday 8am – 6pm |
https://www.formwize.openreach.co.uk/run/survey3.cfm?idx=505d04080808000c |
Catherine Mills |
Mon – Friday 8am – 4pm |
Catherine Mills |
|
3rd Escalation – Managers escalation |
Catherine Mills |
Mon – Friday 8am – 4pm |
catherine.mills@openreach.co.uk 07435663469 |
Level |
Name |
Telephone |
E-mail Address |
First stage check the HUD |
N/A |
Access Via the Openreach Portal |
https://www.openreach.co.uk/cpportal/home |
First contact for queries or issues |
|
GEA-FTTP (including FOD repair) 0800 783 3333 Once the product is selected, listen to menu for either provision and repair FTTP Mon-Fri 8am – 7.30pm Sat- 8am-6pm
eChat (Maximum of 1 query per session) Log in to the Openreach portal and click on the EiVA Logo in the bottom right hand corner of the Dashboard page
Provision: eChat (Maximum of 1 query per session) log in to the Openreach portal and click on the EiVA Logo in the bottom right hand corner of the Dashboard page
Repair: eChat (Maximum of 1 query per session) Log in to the Openreach portal and click on the EiVA Logo in the bottom right hand corner of the Dashboard page or the View My Job Summary page
|
To allow us to validate the CP customer we’re talking to you’ll be asked to provide: · Your Email Address · Company Name · Siebel Ref (1-***) or OGEA · End Customer’s Post Code · Reason for E-Chat
N.B- Please do not duplicate your query by both calling the Openreach Contact Centre whilst performing an E-Chat enquiry
|
1st Escalation |
|
Mon – Sat 8am – 6pm |
GEA-FTTP Process - if this meets the agreed escalation criteria of multiple Openreach failed promises- escalation via this Formwize https://www.formwize.openreach.co.uk/run/survey3.cfm?idx=505d0408090f0b0a Receipt will be either acknowledged or rejected within 4 hours Please refrain from contacting the FTTP desk and await your response. Your case will be managed via the email chain so it’s important you respond to your case handler
Only escalate to 2nd Escalation Level if the operation level agreement isn’t met or your response does not meet your expectations
FOD T2R as GEA-FTTP above |
2nd Escalation |
Clarity should be sought from the named case-handler if still not satisfied or a promise is missed |
Mon – Fri 8am – 6pm |
https://www.formwize.openreach.co.uk/run/survey3.cfm?idx=505d04080808000c
Receipt will be an autoreply with an official response time of 2 working hours
Please refrain from contacting the FTTP desk and await your response. Your case will be managed via the email chain so it’s important you respond to your case handler.
FOD T2R as GEA-FTTP above |
3rd Escalation |
|
Mon – Fri 8am – 6pm |
GEA-FTTP Katie Green –fullfibrenationalperformance@openreach.co.uk FOD T2R as GEA-FTTP above |
Proforma for all FTTC escalations and FVA repair:
* The email subject title must include the text ‘CP Escalation’ to avoid delays in validation.
Escalations will be validated against the acceptance criteria detailed in the next section.
Stage |
Definition |
Communication |
Target time |
One |
New escalation – Formwize received |
auto response |
N/A |
Two |
Escalation accepted/rejected |
Within 4 working hours of receipt (CSM working hours – 8am – 6pm) |
|
Three |
Openreach confirm case handler and next steps |
Within 24 hours of escalation accepted |
|
Four |
Regular timely reviews to match given next review dates |
As advised |
You will be kept informed of progress throughout as follows:-
Stage |
Definition |
Communication |
Target time |
One |
New escalation received in the mailbox / generates a case in SI |
auto response |
24 hours. SLA for response |
Two |
Escalation accepted/ rejected AND Confirmation of escalation reference |
Within two hours of receipt |
|
Three |
Openreach contact CP to confirm next steps |
Within four hours of receipt |
|
Four |
Escalation closed |
N/A |
The sections below detail the criteria you must apply when deciding whether to raise an escalation. In all cases you must contact Customer Service Management in the first instance. If CSM can’t provide an update, you can request an escalation.
Escalation criteria:
There has been more than one failed Openreach promised and there are no meaningful updates from either systems or the Contact Centre to help get the customer’s order back on track
Example of an update which is meaningful – ‘delay rationale is clearly provided with details of actions required and timescales for resolutions’
Step 1 – before you escalate
Escalations are not accepted if the issue is outside of Openreach’s control. Below are simple common examples:
Step 2 – when you can escalate
Common escalations:
Provision escalation criteria for FOD(FTTP on Demand)
Before raising an escalation, you must have first raised a general enquiry with us.
Please note, the escalation process should only be used when seeking an update on the completion of a particular task, where no communication has been received following an enquiry.
You can raise an escalation if we have failed a task or order milestone date, or failed to give you a response when we said we would.
Please provide a clear explanation for your escalation with evidence of the order failing or failed.
Escalation Business Rules
Escalation Business Rules – information needed
• A clear, detailed explanation of the escalation
• Evidence that the order has failed or is currently failing, and it is not a ‘general delay’
• Key milestone failed
• Evidence of contact into the Service Desk before query is raised
• Evidence of failure to respond within 48 hours/agreed date from Service Desk
• Demonstration that time limited information has been given at least 1 Working Day to reach you
• Clear language, no acronyms used
Escalation Business Rules Rejection Criteria
The following scenarios are not valid escalations and will be rejected.
• Updates/Progress – only valid if ECD has already failed
• Traffic Management request for notice / permit reference
• Multiple orders/Openreach Project Services (ORPS)/Value Added Customer Service Team (VACS)
• Build Charges/Disputes
• Order in suspend or customer delay, i.e. Site Not Ready
• Date improvements
• General customer Wayleave issues
• Notification of a problem where the CCD is not in Jeopardy
• Insufficient information or reason for raising a case
Note: some of the above will fall into the accept criteria if you can demonstrate that the issue is not being resolved i.e. no acknowledgement to an enquiry within 3 working days
Service Desk Led FOD Orders
The following section is applicable to the complete journey of orders placed before 01/09/22 and for orders post 01/09/22 before the KCI2 has been sent, where support is led by the FOD Service Desk.
In the first instance, you can call our CSM on 0800 023 2656 (Mon-Fri, 08:00-17:00, excl. bank holidays).
If you have not received an update to your telephone enquiry, you can use this form to raise a formal case for your general enquiry:
Please use HUD. General enquiries should cover situations where we have not provided you with an expected update on your order, examples of this are as follows:
· Site survey appointment booked (not before working day 10 after your order acknowledgement KCI1)
· Survey completed (not before working day 15 after your order acknowledgement KCI1)
· Build cost confirmation (not before working day 25 after your order acknowledgement KCI1)
· A missed milestone, e.g. end customer appointment or completion of planned works.
If you need to raise an escalation on an order, please raise via case management, please use HUD
Below is a staircase for CPs to escalate orders if you don’t receive responses within the agreed timelines
Before escalating from one level to the next, please ensure that the escalation business rules criteria have been met and that the appropriate amount of time has been allowed to receive a response:
• Level 1 – General Enquiry: 48 hours to respond & demonstrate progress
• Level 2 – Escalations: 24 hours to respond & demonstrate progress
• Level 3 - High Level Escalation: 8 hours* to respond, 24 hours to demonstrate progress
• Level 4 - Escalations Manager: 8 hours* to respond, 24 hours to demonstrate progress
• Level 5 - Section Escalations Manager: 8 hours to respond
• Level 6 - Senior Manager – Customer Service
*Refers to 8 working hours, with working hours defined as 8am to 5pm Monday to Friday
For FOD contact details below are only applicable to orders placed before 01/09/22 or for orders post 01/09/22 before the KCI2 has been sent .
|
Name |
Contact Details |
General Enquiry |
FOD Service Desk |
Please use HUD to raise any general enquiries. For any queries, please ensure that you have your Case ID ready and call your Service Desk number Service Desk on 0800 917 6511 Then IVR: Speech-To-Text using the circuit ID – (Example: OGEA), you will then be asked for the department required (08:00-17:00 Monday – Friday) excl. bank holidays). |
Level 1 Escalation |
FOD Service Desk |
Please use HUD to raise any escalations For any queries, please ensure that you have your Case ID ready and call your Service Desk number Service Desk on 0800 917 6511 Then IVR: Speech-To-Text using the circuit ID – (Example: OGEA), you will then be asked for the department required (08:00-17:00 Monday – Friday) excl. bank holidays).
|
DSO and High-Level Escalations Manager
|
HLE team |
Phone: 0800 917 5606 Email: fnd.hle@openreach.co.uk Service Desk on 0800 917 6511
Then IVR: Speech-To-Text using the circuit ID – (Example: OGEA), you will then be asked for the department required (8-5 Monday – Friday) excl. bank holidays).
|
Senior Escalation Manager |
Jo Wade |
Phone : 0331 6200 866 Email: joanne.wade@openreach.co.uk |
Senior Manager – Customer Service |
Alex Nguyen-Xuan |
Phone: 07501 237531 |
The following section is applicable to orders placed on or after 01/09/22, where KCI2 has been sent. Your nominated Project Services coordinator will be managing these orders and made contact accordingly.
|
Name |
Contact Details |
General Enquiry
|
Project Services coordinator |
Contact your nominated Project Services coordinator. Contact details of your coordinator are emailed within 1 working day of KCI2 being sent. Please refer to the email for details . |
Level 1 Escalation |
Project Services coordinator. |
Contact your nominated Project Services coordinator. Contact details of your coordinator are emailed within 1 working day of KCI2 being sent. Please refer to the email for details . |
Escalation Manager |
Contract Delivery Manager |
Contact your nominated Contract Delivery manager. Contact details of your Delivery Manager are emailed within 1 working day of KCI2 being sent. Please refer to the email for details . |
High-Level Escalations Manager |
Ross Sherra |
Email: ross.sherra@openreach.co.uk Mobile: 07889 114089 |
Senior Manager |
Roy Clark |
Email: Roy.clark @openreach.co.uk Mobile: 07918 071221 |
There are some localities where appointment books are not available, e.g. some remote parts of Highlands and Islands. If you have a requirement to report a fault where appointments are required in this scenario then please complete the Manual Fault process template below.
If you have not received a valid Openreach Reference Number, this can be due to data integrity errors which can often be resolved by using the ORDI tool. More information on the ORDI process can be found at:
https://www.openreach.co.uk/cpportal/help/guides
On occasions when the fault raising platform cannot be used due to planned or unplanned outages, system failures, or if requested to by the CSM it is permissible to raise a manual fault request (Not currently available for FTTP).
The completed pro-forma(s) should be attached to an email and sent to the CSM address listed at the bottom of the pro-forma (auto populated when “Circuit Type” is selected.)The fault requests will be validated and processed by the CSM teams who will provide KCI updates via return email. Notice will be given by return email for any requests that fail validation.
Please note: emails must contain single requests (one pro-forma) only; multiple fault requests can be made but will require an additional email for each fault request pro-forma.
Escalation Level |
Name |
Opening Hours |
|
Initial Contact |
Group Mailbox |
Mon-Sat 0800-1800 |
|
1st escalation point |
Amit Jha Sushmita Kumari |
Mon-Sat 0800-1800 |
susmita.kumari@openreach.co.uk |
2nd escalation point |
Aniket Ghosh |
Mon-Sat 0800-1800 |
aniket.2.ghosh@openreach.co.uk |
3rd escalation point |
Shikha Jalali |
Mon-Sat 0800-1800 |
shikha.jalali@openreach.co.uk |
GEA Cablelink
In the event that you need to raise an escalation in relation to a GEA Cablelink order, please follow the path outlined below. Please ensure that you have the relevant details to hand, e.g. order/circuit reference etc. before placing your call.
Level |
Name |
Response time |
Contact Details |
Information Required |
Siebel Port Reference (OGHP circuit designation) and/or Siebel Order Number, site name and L2SID |
||
Level 1 |
Shaun Parker |
Within 24 hours |
shaun.g.parker@openreach.co.uk 03316271916 |
Level 2 |
Jamie Lafferty |
Within 24hours |
jamie.lafferty@openreach.co.uk 07572 987565 |
Cablelink Provision
GEA Cablelink – Modify order enquiries
For enquiries relating to a GEA Cablelink Modify order, please report an Incident via the Openreach Service Desk. You can raise an Incident through the Customer IT Zone on the Openreach Portal. Click on “Report a new system related issue”.
When completing the System issue reporting form please select “Other” in the Product drop-down menu.
When submitting your enquiry please include the following information in the “Description of issue” field:
• State: “Openreach NGA – GEA Cablelink (OGHP) Modify order enquiry.”
• Briefly describe your enquiry, e.g. “Enquiry relating to an overdue order.”
• Include details of the order/s in question:
• Order reference: 2-xxxxxxxxxxxxx
• GEA Cablelink Id: OGHPxxxxxxxx
• VLAN Id / outer tag you are trying to add: 2-3000, 3070-4094*
• What error message are you seeing, if any?
• Date order submitted: xx/xx/xxxx
• Please also include the following text:
• “Please direct this Incident Report to the FTTP FLOW application support group (APLSUPORSIEBEL).”
GEA Cablelink Fault Reporting
This section explains how Openreach will accept and respond to GEA Cablelink fault reports.
Reporting a fault
GEA Cablelink-related faults may be reported to Openreach at any time; 24 hours a day, 7 days a week, 365 days a year. The fault reporting process is outlined in the diagram below.
The process
• If a CP identifies a cable link-related fault out-of-hours they can submit a template via email to Openreach (clt2r@openreach.co.uk) requesting further investigation. The CP should provide a sample of GEA services (OGEA references) impacted by the problem (template is attached below).
• Once the template is received, Openreach will endeavour to respond by email within 30 minutes, confirming either acceptance or rejection.
• A unique infrastructure event (IE) reference will be quoted in the email. If a major service outage (MSO) is raised, the reference will also be quoted.
• Openreach will not update the CP via e-mail once the acceptance email has been sent.
• Openreach will diagnose the issue and take relevant steps to resolve. If there is a need to contact the CP network operations for information or assistance we will do so using the contact details provided.
• IE and MSO updates will be available through the establish channels: Openreach Portal, Fault Tracker, B2B, or email. CPs will need to check they can consume these updates.
• Alternatively the incident management customer communications (IMCC) team can be contacted via eChat Log into the Openreach portal and click on EiVA logo in the bottom right hand corner of the Dashboard page during business hours (Mon-Fri 8am to 5pm)
Acceptance criteria
• The CPs is asked to provide an email address for updates, and contact details in the event that cooperation is required. This information is optional, however please note that if a CP does not provide contact details we may be unable to progress the investigation.
• Openreach will only accept contact from a CP owning GEA Cablelinks. Enquiries from downstream service providers or end customers will be rejected.
• Contact is strictly limited to fault reports relating to GEA Cablelink.
• When completing a Cablelink issue template – please complete all sections including examples of OGEA references affected or annotate why information is not able to be provided. Failure to do so could lead to Template being rejected By Openreach
• A fault can be reported by a CP against any commissioned GEA Cablelink in the UK and Northern Ireland.
• Openreach will not accept calls requesting updates.
Escalation path
• If there is any issue with your fault report submission during business hours (Mon-Fri 08:00-17:00) you can contact the IMCC via Chat during business hours.
•
Multicast
Multicast for GEA – Provide and Modify order enquiries
For enquiries relating to a Multicast for GEA Provide or Modify order, please report an Incident via the Openreach Service Desk.
You can raise an Incident through the Customer IT Zone on the Openreach Portal. Click on “Report a new system related issue”.
When completing the System issue reporting form please select “Multicast” in the Product drop-down menu.
When submitting your enquiry please include the following information in the “Description of issue” field:
• State “Openreach NGA – Multicast VLAN (OGMC) Provision/Modify order enquire
• Briefly describe your enquiry – e.g. “Enquiry relating to an overdue order”
• Include details of the order(s) in questions:
• Please also include the following text:
Please direct this Incident Report to the FTTP FLOW application support group “ (APLSUPFTTPFLOW)”