CP Portal
login
close dropdown menu
  • Customer IT zone
  • Settings
Logout

  • Products
    • Overview
    • The All IP Programme
      • Overview
      • Exchange Exit
      • Test Lab
      • Businesses and Services
      • Stop sell
      • WLR Withdrawal
      • Collateral
      • All IP Trials
    • Fibre Broadband
      • Overview
      • Ultrafast
      • FTTP
      • FTTP on Demand
      • Gfast
      • SOGfast
      • Superfast
      • FTTC
      • SOGEA
      • Installation Options
      • Overlay Services (GEA Multicast)
      • Fibre contracts
      • Knotx
    • Copper
      • Overview
      • MPF & SMPF
      • Broadband Enabling Technology (BET)
      • WLR
      • Wholesale Analogue Access (PSTN)
      • Wholesale Line Rental 3 (WLR3) Premium
      • Calling and network features
      • Wholesale Digital Access ISDN2
      • Wholesale Digital Access ISDN30
      • SOTAP
      • Copper contracts
      • Local Loop Unbundling (LLU)
      • Sub Loop Unbundling (SLU)
    • Ethernet
      • Overview
      • Ethernet Access Direct
      • Ethernet Backhaul Direct
      • Specialist access services
      • Ethernet data centres
      • Resilience
      • Contracts
      • Ethernet Access Direct Sensitive
    • Optical
      • Overview
      • Optical Spectrum Access (OSA)
      • Optical Spectrum Extended Access(OSEA)
      • Resilience
    • Passive products
      • Overview
      • Physical Infrastructure Access(PIA)
      • Mobile Infill Infrastructure Solution
      • Passive contracts
      • Building Digital UK (BDUK)
      • Dark Fibre
    • Exchange Based Products
      • Overview
      • Co-mingling
      • Access Locate and Access Locate Plus
      • Internal tie cable
      • Enhanced specification internal tie cable
      • Ethernet Cablelink
      • Distant location
      • GEA Cablelink
      • Network investigation process
      • Contracts
    • Product Development Processes and release information
      • Overview
      • Statement of Requirements (SOR) Process
      • Openreach Product Development Process (C2M)
      • Product release documentation (EIP Comms)
      • Product roadmap
    • Product withdrawal
      • Overview
      • Backhaul Extension Services (BES)
      • Backhaul Network Services (BNS)
      • Openreach Network Backhaul Services (ONBS)
      • TDM (Time Division Multiplex) access bearer
      • Wholesale Extension Services (WES) and Wholesale End-to-End Services (WEES)
      • WES Aggregation
      • CCTV Access
      • Fibre Voice Access
      • Wlr Withdrawal
      • Stop Sells Updates
    • Ancillary Documents (Change Control)
    • Contracts
      • Overview
      • SOGEA and SOGfast
      • Data Privacy
    • Industry Consultations
    • FlexZones
    • Product Process descriptions
      • Overview
      • FTTP
    • Pricing
  • Services
    • Overview
    • Product services
      • Overview
      • Flexible appointments
      • Number portability
      • Events and exhibitions
      • Non standard lines
      • Network in advance
      • Stand alone survey (SAS)
      • Excess construction charges (ECC)
      • Directory and number information
      • Nuisance Calls Service
      • Ethernet transfer of service
      • Advanced order management process
      • Special fault investigation assure
      • Service maintenance levels
      • Product migrations
      • Bulk modifications
      • Time related charges (TRCs)
      • Large Scale Time Related Charges
      • Transfer of service
      • Name changes
      • Novations
      • Service products contracts
      • KPIs
      • Service Level Commitments
      • Digital Price Book
      • One Touch Switch
      • Direct End Customer Contact
    • Discover our infrastructure build and value add services
      • Overview
      • Infrastructure
      • Full fibre infrastructure build (FFIB)
      • Engineering services
      • Project services
    • Bid Management
    • Wayleaves
  • Industry Engagement
    • Overview
    • Groups
      • Overview
    • Events
      • Overview
  • Updates
    • Overview
    • Briefings
      • General briefings
    • Matters Beyond Our Reasonable Control
    • Calls
    • System notifications
    • Notifications
      • Overview
      • Notifications
      • COVID 19
    • Status
  • Help & Support
    • Overview
    • FAQs
    • Guides
    • Customer service plans
      • Overview
      • Ethernet Services
      • WLR
      • LLU
      • Ultrafast and Superfast Fibre Access
      • Physical Infrastructure Access (PIA)
      • MiiS
      • Dark Fibre (DF)
      • CSP Common Sections
    • Customer test services
    • Customer establishment
    • Ethernet Deemed Consent
    • Suppliers’ information notes (SINS)
      • Supporting Documents
    • How to contact Openreach
    • How to use the portal
    • Help with the portal
      • Help with the portal
    • Risk Assessment and Method Statement
    • Single Sign On
    • Sabor
    • Transflex
    • Reports
  • Dashboard
  • Network Status
  • CP Admin
  • Site Admin
  • Reseller Portal
  1. Home
  2. Help & Support
  3. Customer service plans
  4. Getting started
  5. Repair
Share

Follow this page

Customer Service Plan

Select your product to see the specific
Customer Service Plan

LLU - version 108

Download Full Document

  • Getting started
  • Order and Fault Trackers / View my Job
  • Provision
  • Repair
  • Third Party Damage
  • Infrastructure Solutions
  • Billing
  • Complaints
  • Expedites
  • Directors Service Office (DSO)
  • Emergency welfare
  • Application Service Desk
  • Network addressing
  • Number porting
  • Other Services
  • Appointed Journey Process – potential issue contact
  • Emergency Restoration of Copper (ERoC)
  • Service Level Agreements and Service Level Guarantees
  • Stop sell exceptions

Repair

Last updated: 13 September, 2024

LLU Fault Reporting Process

CP fault reports for Metallic Path Facility and Shared Metallic Path Facility and Broadband Enabling Technology will be handled by the Openreach Assurance Service Management Centre. The method of fault reporting is via either B2B Gateway or the Openreach portal.

For MPF, Openreach will require CPs to provide information to demonstrate that the fault lies within the Openreach network. It is the CPs responsibility to prove a fault off their network before raising a fault with Openreach. All faults will be submitted to Openreach by the CP.

Individual fault reports must be raised where the original delivery was dealt with as a multiple MPF project managed installation. Standard criteria for fault reporting will apply

For SMPF and Broadband Enabling Technology, all fault reports relating to the high bandwidth portion of a Shared MPF will be submitted to Openreach by the CP.  Openreach will not accept any fault reports from an End User for this portion of the line. All fault reports relating to the PSTN service on the shared line will be submitted to their Communications Provider by the End User.

To access information / guidance with placing MPF / SMPF faults:-

Information relating to the LLU product range, including product / process descriptions, Business Process Models (BPM) and Release documentation, can be accessed via the Openreach website at www.openreach.co.uk/llu. For additional information you may access the LLU Secure Area, using your log in details.

 

Access Locate and LLU Service Assurance

Faults may be reported to Openreach CSM 24 hours a day, 7 days a week and 365 days a year (including UK Public / Bank Holidays). 

If further assistance is required please contact CSM who will validate the request and give assistance 

 

Non Appointable Locations 

There are some localities where appointment books are not available, e.g. Highlands and Islands.  If you have a requirement to report a fault where appointments are required in this scenario then please complete the Manual Fault process template below.

 

Manual Fault Raising

If you have not received a valid Openreach Reference Number, this can be due to data integrity errors which can often be resolved by using the ORDI tool. More information on the ORDI process can be found at:

https://www.openreach.co.uk/cpportal/cpzone-ciz/information-and-user-guides

On occasions when the EMP fault raising platform cannot be used due to planned or unplanned outages, system failures, or if requested to by CSM it is permissible to raise a manual fault request. 

The completed proforma(s) should be attached to an email and sent to CSM address listed at the bottom of the proforma (auto populated when “Circuit Type” is selected.)The fault requests will be validated and processed by CSM teams who will provide KCI updates via return email.  Notice will be given by return email for any requests that fail validation.

Please note: - emails must contain single requests (one proforma) only; multiple fault requests can be made but will require an additional email for each fault request proforma.

  • < class="fileList-title"> LLU Manual Fault Proforma August 2020
    Size: 28 KB

If your request concerns an Emergency Welfare customer, and this is during an EMP planned / unplanned outage - please title your fault request “Emergency Welfare - Manual Fault Request”. This will ensure the request is prioritised above other lower priority faults. 

Escalation Level

Name

Opening Hours

Email

Initial Contact

Group Mailbox

Mon-Sat 0800-1800

lluassuranceemp@openreach.co.uk

1st escalation point

Amit Jha

Sushmita Kumari

Mon-Sat 0800-1800

amitkumar.jha@openreach.co.uk

susmita.kumari@openreach.co.uk

2nd escalation point

Aniket Ghosh

Mon-Sat 0800-1800

aniket.2.ghosh@openreach.co.uk

3rd escalation point

Shikha Jalali

Mon-Sat 0800-1800

shikha.jalali@openreach.co.uk

Hostel Power Maintenance Problems

CP fault reports for Hostel Power Issues should be reported via the stated 0800 Assurance number listed within the Access Locate and LLU CSP. Communication Providers must prove all Hostel Power issues onto the BT Network prior to reporting a fault.

On receipt of a proven BT Network Power fault, Openreach will require the following information

• The address of the exchange affected – Battersea etc, with road name or similar to confirm location

• The location of the hostel in relation to the main access to the building

• Access to the hostel if applicable

• Contact details for the Communications Provider

• Information as to the exact nature of the fault, needs to be factual, accurate and relevant

• Contact details for the CP engineer who proved the fault so that co-operation can take place

• Location of power units within the hostel if known

• Information relating to item of kit affected, fuse size etc.

Building Maintenance Problems

CP fault reports for Hostel Building maintenance Issues should be reported to BTFS Building services via 0800 223 388.

On receipt of a building maintenance problem, BTFS will require the following information

• The address of the exchange affected – Battersea etc, with road name or similar to confirm location

• The location of the problem – door to hostel jammed etc.

• Contact details for the Communications Provider

• Information as to the exact nature of the problem, needs to be factual, accurate and relevant

• Contact details for the CP engineer who identified the problem so that co-operation can take place

• If a maintenance problem is proved by Openreach to be the fault of the Communications Provider, then an abortive visit charge will be raised in line with the current Openreach price list.  

Escalations - Hostel Power & Building Maintenance Problems

There is no escalation process for either hostel power or building maintenance issues, and resource is supplied on a reasonable endeavours basis by Openreach. Updates for reported issues will only be given by calling the 0800 number given above.

 

Point of Presence reporting 

The Openreach Access Locate and LLU Repair PoP support team will record and manage each CP reported PoP fault. It will provide the caller with a unique Openreach fault ID reference number when the fault is reported. The PoP support team will liaise with the internal supplier(s) responsible for the investigation and resolution of each fault type and faults will be tracked through to closure. A record of reported faults and the action taken to resolve them will be held against each PoP over its operational life. Each reported fault will be assigned the relevant fault category (A, B, C or D) as per the definitions within the RANF. This will ensure focus on meeting the relevant SLA target clearance time which begins from the moment the fault ID reference number is generated.

Access Locate and LLU PoP faults comprise:-

• Power faults/damage – AC mains feed, isolation switch, power socket, BT maintained DC, BT maintained AC UPS, environmental temperature range to ETS 300 019 climatogram, product lighting, electricity sub-metering.

• Site physicals and condition – e.g. safety hazards, building fabric, water ingress, actions of individuals, signage, welfare facilities, waste/cleanliness.

Note: Physical access security issues must still be raised with BT Security on 0800 321999 in the first instance. However, should the response not prove satisfactory then this may be reported to the Access Locate and LLU Repair Service Management Centre PoP support team on 0800 085 0642 option 1.

• Damage to an LLU PoP structure – including damaged or missing labelling. 

• Hazards presented by any equipment located within or on an PoP.

• Tie Cables – physical damage and/or multiple faulty pairs, labelling issues, HDF/MDF damage.

• PoP installation operability and quality of cabling and associated items. Note: Ethernet circuit failures should continue to be reported in the first instance to the Ethernet Repair team on 0800 028 2268.

Access Locate and LLU Repair Contacts

The following table lists useful points of contact and references in relation to your Local Loop Unbundling Service.



 

CONTACT

NOTES

LLU REPAIR

 

 


CSM

0800 783 3333 – suspended until further notice

 or preferred:

Use the Request for Contact button on Fault Tracker to obtain a ticket reference then call.

 

Point of contact for all Openreach End User fault reporting and fault enquiries – all faults must be placed via your chosen Openreach repair mechanism initially.

 

Openreach Backhaul Repair

Please report faults using eCo Repair/EMP or contact

0800 028 2268

Any faults should be reported electronically using your chosen Openreach repair reporting mechanism (EMP or eCo) or the 0800 number. An out of hours contact number is contained in the CSP.

 

 

Openreach Access Locate and LLU PoP Repair

0800 028 2268 Option 2

 

 

Point of contact for reporting in-life faults or associated environmental problems specific to a ‘Point of Presence’ (POP)

 

 BTFS Building Services

0800 223388

Point of contact for Openreach Buildings Maintenance enquiries and fault reports.

 

MPF and SMPF Repair Contacts

MPF/SMPF REPAIR

CONTACT

NOTES

MPF/SMPF/SFI General Use

eChat – (Maximum of 1 query per session, except where orders at the same premises)

 Log in to the Openreach portal and click on the Eiva Logo  in the bottom right hand corner of the Dashboard page

 

Opening times: Mon – Fri: 08:00 - 22:00

Sat – Sun: 08:00 – 19:00

 

Point of contact for all Openreach End User fault reporting and fault enquiries – all faults must be placed via your chosen Openreach repair mechanism initially.

 

CSM

0800 7833333 (24 hour) – suspended until further notice

 or preferred:

Use the Request for Contact button on Fault Tracker to obtain a ticket reference then call.

Point of contact for all Openreach End User fault reporting and fault enquiries – all faults must be placed via your chosen Openreach repair mechanism initially.

All enquires, with the exception of Repeats, can and will be dealt with by CSM either through the Openreach portal, or by calling the CSM telephone number

In all cases prior to contact, the Communications Provider must check for updates on the relevant CP Portal.  Contact to Customer Service Management  (CSM) must only be made in the event that up to date notes are not available.  If a satisfactory update cannot be provided CSM, then please proceed to the appropriate escalation path as detailed below:

Repair Escalation Contacts

Where Openreach has failed to meet a delivery commitment/Service Level Agreement and no update is available on the tracker, please contact 0800 7833333 in the first instance or alternatively use the request for contact button on Fault Tracker to obtain ticket reference then call 0800 0323032. – suspended until further notice . Where no update is available the CP can escalate the issue using the process below: 

Level

Details

1st Escalation                               

Where Openreach have failed commitment or resolution timescales please use the link below. First contact routes MUST be followed or case will be rejected.

https://www.formwize.openreach.co.uk/run/survey3.cfm?idx=505d0408090f0b0a

2nd Escalation               

               

Please escalate using the link below if failed commitment at First level escalation. A manager will review and respond

https://www.formwize.openreach.co.uk/run/survey3.cfm?idx=505d04080808000c

 

3rd Escalation

Cathy Mills, 08:00 – 16:00

catherine.mills@openreach.co.uk

SLU Repair Contacts/Escalation

Level

Name

Opening Hours

Contact Details

First Contact for Queries / Issues

Team Member

Mon-Fri: 08:00-17:00

slu.faults.inbox@bt.com

1st Escalation

Repair Team Leader

Mon-Fri: 08:00-17:00

slu.faults.inbox@bt.com

2nd Escalation

Repair Team Manager

Chhabra Keshav

Mon-Fri: 08:00-17:00

chhabra.keshav@openreach.co.uk

3rd Escalation

Repair Senior Manager
Shikhha Jalali

Mon-Fri: 08:00-17:00

shikha.jalali@openreach.co.uk

4th Escalation

 

CSM Manager

Rebecca Jones 

Mon-Fri: 08:00-17:00

rebecca.jones@openreach.co.uk

Out of hours MPF and SMPF process

Activity

OOH

Contact details

Tier 1

19:30-08:00

Ask to speak to the duty manager.

Service Levels 

CPs will be able to report faults 24 hours a day, 7 days a week, 365 days a year (including UK Public and Bank Holidays).

Service Maintenance Levels 2, 3 and 4 are available and it is possible to change the Service Maintenance Level. For further details on the Service Maintenance level please see the “MPF Product Description” and “SMPF Product Description” at www.openreach.co.uk/mpfsmpfpd

Best Practises 

 

LLU Repair (ASSURANCE)

It is imperative that all faults reported to Openreach have the correct and required information to allow for prompt resolution. Inaccurate information may lead to delays for both yourself and your End User.

 

General Fault Reception

In order to ensure that Openreach are able to maximise the benefits that Production Management brings to the management of EU faults it is essential that the following practices are adhered to.

 

Structured Questions

It is essential that the structured questions are followed

In particular attention should be paid to the following critical pieces of information:

• Please ensure that the End User disconnects all known equipment from the NTE

• Please ensure that the End User takes down the firewall or gives accurate contact details to allow Openreach to co-operate with the End User direct to take the firewall down, with preferred times etc.

• Site access times – in case an engineering visit is required

• Always provide robust End User contact details with alternative options if relevant

• Clear, concise and full details of the fault conditions – the most powerful diagnostic tool we have in repair is the detail that the End User is able to provide. Please ensure the results of any diagnostics undertaken are logged.  

Please note if any of the above is not available to Openreach we will be unable to validate the fault and it may be subject to delay in restoration of service

 

Repeat Faults

On receipt of a fault please ensure that the End User is asked the question as to whether there has been a fault reported on the circuit within the last 28 days. If it has please determine whether the circuit has

• Failed retest

• Repeated with the original fault conditions

• Repeated with differing fault conditions to the original

This information will help Openreach to resolve issues with repeat faults more effectively whilst helping with future root cause analysis.

  • Help and Support
    • Overview
    • Damage Health and safety
    • Questions about fibre availability
    • Crimes and scams
    • How to contact Openreach
    • How to use the portal
    • When can I get fibre
  • About us
    • Overview
    • Who we are
    • Leadership and Governance
    • Our history
    • Our performance
    • Openreach.com
Follow us

Follow us

Twitter Created with Sketch.
Facebook Created with Sketch.
  • News and Opinion
  • Press and media
  • Privacy policy
  • Terms and conditions
  • Disclaimer
  • Cookies
  • Accessibility
  • Commitments monitoring office
  • Equivalence

© British Telecommunications Limited 2026